With only a month and a half until the planned opening date, things are really moving along.
The main entrance.  Flag poles are in place and most of the exterior has been painted.
The view past the multi-level classroom wing.
The reception area just inside the front door.  The large window leads into the main office area with Mrs. Derksen's desk and the green framed door is Mr. Krahn's office
Mrs. Derksen's desk is in place inside the main office area.
The main window into the office area from the hallway.
The new gymnasium still has some work to be done.
A very unfinished stair well from the upper classroom wing.
The lower classroom hallway.  Flooring is in place as well as the wall trimings.
The new library.
The staff room starts to take shape.