With only a month and a half until the planned opening date, things are really moving along. |
| The main entrance. Flag poles are in place and most of the exterior has been painted. | ![]() |
![]() |
The view past the multi-level classroom wing. |
| The reception area just inside the front door. The large window leads into the main office area with Mrs. Derksen's desk and the green framed door is Mr. Krahn's office | ![]() |
![]() |
Mrs. Derksen's desk is in place inside the main office area. |
| The main window into the office area from the hallway. | ![]() |
![]() |
The new gymnasium still has some work to be done. |
| A very unfinished stair well from the upper classroom wing. | ![]() |
![]() |
The lower classroom hallway. Flooring is in place as well as the wall trimings. |
| The new library. | ![]() |
![]() |
The staff room starts to take shape. |