May 6, 2000
![]() |
On top of each concrete floor section now rests a wall waiting to be raised. This is the multi purpose area beside the gym. |
| The gym's walls are poured. | ![]() |
![]() |
A great deal of concrete came to the site this week. Almost every square metre of floor has a wall waiting to be raised. |
| This is the office area. | ![]() |
![]() |
|
| The square "tower" is the elevator shaft for the lower classroom section. | ![]() |
![]() |
The lower classroom wing with the elevator shaft in place. |
| The lower wing facing directly at the elevator shaft. | ![]() |
![]() |
The west side of the lower classroom wing facing back up to the gym. |
| Across the school driveway facing west. | ![]() |
![]() |
From the same location as above - the second half of the site. |