Pictures Taken
May 6, 2000

On top of each concrete floor section now rests a wall waiting to be raised.  This is the multi purpose area beside the gym.
The gym's walls are poured.
A great deal of concrete came to the site this week.  Almost every square metre of floor has a wall waiting to be raised.
This is the office area.
The square "tower" is the elevator shaft for the lower classroom section.
The lower classroom wing with the elevator shaft in place.
The lower wing facing directly at the elevator shaft.
The west side of the lower classroom wing facing back up to the gym.
Across the school driveway facing west.
From the same location as above - the second half of the site.