Pictures Taken
May 23, 2000
![]() |
Looking from the elevator toward the community use wing - the roof supports are being placed. |
| Inside the gym. | ![]() |
![]() |
The second floor classroom wing is getting a "second floor". |
| This has been a week for iron work. | ![]() |
![]() |
Inside the two floor classroom wing. |
| Inside the classroom wing looking out toward the main parking lot. | ![]() |
![]() |
Again, looking out through the classroom wing. |
| Steel roof supports waiting to be raised. | ![]() |